removal

Spoil & tipper haulage

After a dig, excess soil has to leave the block. We load, tip and dispose lawfully so the build keeps moving — Melton, Werribee, Tarneit, Point Cook and across Greater Melbourne.

Tipper and grader clearing spoil from a Melbourne construction site

What we cart

  • Spoil after excavation and site cuts
  • Site clearing and construction rubbish
  • Clay, rock, fill and approved contaminated spoil
  • Residential landscaping soil loads
  • Bundled with site cut packages

Builders want tippers on site when the dig starts — not a middleman booking hire trucks later. We run excavators and tippers from the same crew, so spoil can leave the same day when access allows.

Why our tippers

Piled-up spoil slows every trade. Our trucks clear Melton and Melbourne sites with excavators from the same fleet.

Own fleet

Our trucks and drivers — no waiting on third-party haulage when the dig is ready to load out.

Houses & commercial

From a few loads on a home build to multi-day tipper runs on bigger developments — we match load count to access.

Soil removal FAQs

How much does soil removal cost?

+

Depends on volume, spoil type, tip fees and access. Most residential jobs are per tipper load or a day rate with loads included. Call for a free estimate.

Do you remove soil after a site cut?

+

Yes. We usually dig and tip together so spoil leaves the block the same day.

Which suburbs do you cover?

+

Melton, Werribee, Hoppers Crossing, Tarneit, Truganina, Point Cook, Caroline Springs, Sunbury, Craigieburn and surrounding Greater Melbourne suburbs.

Related: Site Cut Melbourne · Truck Work Melbourne · How long does soil removal take?